« Wednesday, August 23 - The siding is done. Soffits are up. | Main | Friday, August 25 - Texture »

Thursday, August 24

I got a chance to see the completed siding tonight. It looks pretty good. I like the little touches like the louvered dryer vent, and the frames for the outlets.

Inside, they hooked up the incoming water line to the outside faucets and a location for the water softener. The outside faucets bypass the watersoftener. I think there is also a connection for a pre-softener line to the kitchen sink. (I couldn't follow the line to the fridge...that probably shouldn't be softened either.) Of course the way they hooked up the lines...it makes it hard to use the space in the basement. Where they put it has gone from possible future guest room to storage, to well still storage, but now we have to work around the lines.

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)

About

This page contains a single entry from the blog posted on August 24, 2006 10:56 PM.

The previous post in this blog was Wednesday, August 23 - The siding is done. Soffits are up..

The next post in this blog is Friday, August 25 - Texture.

Many more can be found on the main index page or by looking through the archives.

Powered by
Movable Type 4.1