« Wednesday, June 14 | Main | Friday, June 16 »

Thursday, June 15

We have first floor interior wall framing!!!

Garage walls are up (except one window is framed, but not cut out yet????)

Obviously, the first floor sub-floor is in

Meter reads 5 KWH used

They've backfilled & rough graded

Piles of dirt are gone in front

One huge pile left in back

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)

About

This page contains a single entry from the blog posted on June 15, 2006 4:29 PM.

The previous post in this blog was Wednesday, June 14.

The next post in this blog is Friday, June 16.

Many more can be found on the main index page or by looking through the archives.

Powered by
Movable Type 4.1